QUOTE BUILDER
Define your job, let the technical office price it
As you fill in the fields the quote summary builds on the right. Send it as it is and the technical office prices your exact piece, not an average.
Your piece, not an average. The technical office prices exactly the job you describe.
Two pricing bases. Toll work is calculated on machine hours, stock production per cubic metre.
A single pallet counts as an order. A trial and a series order run the same line, with the same quality record.
Turn this summary into a quote
m³or machine hours · transparent tariff

KASTAMONU OIZ
An example definition. The summary updates instantly as you change dimensions, species and operations.
SPECIES
JOINT TYPE
WIDTH600 mm
LENGTH3,000 mm
THICKNESS26 mm
QUANTITY100 pcs
REQUIRED OPERATIONS
TOTAL VOLUME
4.68m³
100 pcs × 0.0468 m³
- Job type
- Toll processing
- Species
- Fir
- Joint type
- Finger-jointed
- Piece size
- 26 × 600 × 3,000 mm
- Operations
- Kiln drying, Planing
- Estimated machine hours
- 14.0 hours
Toll work is priced on machine hours, stock production per cubic metre. A binding quotation is issued after inspection of the material.